Malaysian business licence·State

Support for Application for Junction / Access Road to Quarry / Mining Area

Issued by Jabatan Kerja Raya Negeri SembilanTechnical Road Instructions: ATJ 38/2018; Guidelines For Traffic Impact Assessment

Overview

This license supports the application for access roads to quarry and mining areas. It is required for developers and civil engineering consultants to ensure compliance with safety and traffic regulations. The license permits the construction and maintenance of access roads in accordance with specified guidelines.

Key details

Governing Act
Technical Road Instructions: ATJ 38/2018; Guidelines For Traffic Impact Assessment
Agency fees
RM 20,000 deposit required for bank guarantee.
Validity
Annual renewal typical
Issuing authority
Jabatan Kerja Raya Negeri Sembilan

Fees shown are government / local-authority fees payable to the issuing agency. Emerhub charges a separate service fee for handling the application end-to-end.

Eligible applicants

Developers, certified civil & structural consultants

Application requirements

- Submit Traffic Impact Assessment (TIA Report) in hardcopy & softcopy for review. - Submit RSA Report Stage 1 - 5 in hardcopy & softcopy for review. - No sand excavation allowed within JKR road reserve. - Sand excavation must be at least 100 meters from JKR road reserve and 500 meters from bridge structures. - If involving JKR roads, approval for access intersections must be obtained. - Access road must be paved for 150 meters from existing road edge. - A washing trough must be provided 150 meters before the intersection. - Intersections must be built according to plans certified by a Professional Engineer. - Access roads and intersections must be kept clean. - Ensure safety of government property and stability of excavation slopes. - Excavation operations must not cause flooding in road reserve areas. - When crossing ditches, a culvert of size 1.2m x 1.2m must be constructed. - No sludge or water from excavation operations should flow into road drains. - Access road gradient must not exceed 2% for 50 meters from existing road edge. - Warning signs must be installed and maintained at access points.

Agency fee breakdown

1. Applicants must deposit a Bank Guarantee / Bank Draft of RM20,000.00 for road maintenance during defect liability period or until 12 months after the Certificate of Completion and Compliance (CCC) is issued.

These are amounts payable to Jabatan Kerja Raya Negeri Sembilan. Emerhub's service fee is quoted separately when you engage us.

Which businesses need it