0620
Extraction of natural gas
Case-by-case approval
Upstream petroleum operations require Production Sharing Contract (PSC) with Petronas. Foreign participation is structured via PSC terms, not equity.
- Foreign equity
- 100%
- Capital floor
- None
- Setup timeline
- 8–12 wk
Sector approval required
Standard Sdn Bhd RM 1
Foreign Sdn Bhd via Emerhub
Set up for this MSICOne-business-day quote · MSIC 0620 pre-filled
Investment policy
Foreign ownership rules
Foreign ownership rules
- Oil & Gas UpstreamconditionalPETRONAS
Upstream petroleum operations require Production Sharing Contract (PSC) with Petronas. Foreign participation is structured via PSC terms, not equity.
Source
Sourced from MIDA sector booklets and respective regulators. Verify the latest rules with the regulator before investment decisions.
此类有 5 个项目
项目
- 06201Production of crude gaseous hydrocarbon (natural gas)Production of crude gaseous hydrocarbon (natural gas)
- 06202Extraction of condensatesExtraction of condensates
- 06203Draining and separation of liquid hydrocarbon fractionsDraining and separation of liquid hydrocarbon fractions
- 06204Gas desulphurizationGas desulphurization
- 06205Mining of hydrocarbon liquids, obtain through liquefaction or pyrolysisMining of hydrocarbon liquids, obtain through liquefaction or pyrolysis